Contact – Smart Switch OEM & ODM Manufacturer

24h response from founder Ryan Gu. Factory-direct pricing. Engineered for ETL Standards (UL 60730-1). MOQ 500 — your trusted Matter smart switch OEM & ODM manufacturer.

ETL-Ready
FCC Certified
100% In-House SMT
24h US Support

Contact Smart Switch OEM ODM Manufacturer

Back to Home | View Products | OEM/ODM Capabilities | About Us

Years R&D

Automotive-grade since 2008

In-House SMT

UL-listed components / Zero outsourcing

Client Rating

Verified B2B partners

Response Time

Direct founder access

Custom Firmware & Hardware

Matter, Zigbee, Wi-Fi. 15+ engineers.

ETL & FCC Compliance Ready

Engineered for ETL Standards (UL 60730-1). Audit-ready docs.

Direct Factory Access

No brokers. Speak directly to our founder.

Shenzhen Kaiming Technology Co., Ltd. is a 100% in-house family-owned factory vs. Other Suppliers

Shenzhen Kaiming Technology Co., Ltd.Typical Chinese Factory
In-House SMT✅ 100%❌ Often outsourced
Engineered for ETL Standards (UL 60730-1)⚠️ Not guaranteed
Founder Engineering Access✅ Direct❌ Sales gatekeepers
MOQ500 units1000+ units
Response Time24h3-5 days

Trusted by Smart Home Brands Worldwide — Matter Smart Switch OEM&ODM Manufacturer

“Shenzhen Kaiming Technology Co., Ltd.’s in-house SMT and FCC readiness cut our certification timeline significantly.” — North American Hospitality Integrator

⭐ ⭐ ⭐ ⭐ ⭐

“Shenzhen Kaiming Technology Co., Ltd.’s documentation — Engineered for ETL Standards (UL 60730-1) — saved us 3 months of certification time.” — European Smart Home Distributor

What is your minimum order quantity (MOQ)?500 units. Flexible for first-time partners for a Matter smart switch OEM manufacturer.
Do you provide ETL certification support?Yes. Engineered for ETL Standards (UL 60730-1). Full documentation and audit-ready files provided for your brand’s certification.
Can you customize firmware and hardware?Yes. Matter, Zigbee, Wi-Fi. PCB, enclosure, private label.
How fast do you respond to RFQs?Within 24 hours. Founder Ryan Gu personally reviews all inquiries.
What is your typical lead time?Samples: 7-14 days. Mass production: 30 days after approval.

Contact – Smart Switch OEM & ODM Manufacturer

Global Headquarters

Room 512, Building G, Yuxing Technology Industrial Park,Xixiang, Bao’an District, Shenzhen, China

Manufacturing Base

No. 162 Jinbi Road, Pingshan District, Shenzhen, China.
Direct-Owned Facility: Shenzhen Kaiming Technology Co., Ltd. (Audit-Ready)

Scroll to Top